— 产品中心 —
邮箱:A3669372910@163.com
手机:17359299796
电话:17359299796
地址:福建省漳州市龙文区朝阳北路1号办公楼205室
DS200TCRAG1ACC继电器输出板Mark V板美国通用电气GE品牌GE通用电气加工定制否规格6*6产品名称Mark V 板生产地美国输入电压34V是否包邮顺丰秒发起发34库存充足价格优势电流34W成色全新重量0.34kg材料PLC质保12个月性能好计量单位个运用工控仪器仪表配件工作温度干燥可售卖地北京;天津;河北;山西;内蒙古;辽宁;吉林;黑龙江;上海;江苏;浙江;安徽;福建;江西;山东;
产品详情
DS200TCRAG1ACC继电器输出板Mark V板美国通用电气GE
DS200TCRAG1ACC继电器输出板Mark V板美国通用电气GE
GE继电器输出板DS200TCRAG1ACC装有30个插入式继电器。它还有4个34针连接器和4个12针连接器。分配给34针连接器的id是JOR、JOS、JOT和JO。分配给12针连接器的id是JS3、JS4、JS5和JS6。
由于GE继电器输出板DS200TCRAG1ACC上有多个连接器,因此必须遵循指南,以确保您可以快速将电缆连接到替换板上的正确连接器。在开始更换之前,请确保您知道驱动电流紧急切断装置的位置。
此外,您必须了解如何操作关闭装置,并确认其处于良好的工作状态。熟悉传动装置安装的人员将获得有关电源和紧急切断的详细信息。下一步是验证硬盘周围区域的地板是否干净,没有湿气或积水。使用清洁剂清除地板上的油污。您还应该移除所有未接地的双头电源线,因为有触电的危险。
最佳做法是通知工作区域内其他设备的操作人员和管理人员,工作已经安排好,以便他们能够为工作中断做好计划,并制定应对计划。在硬盘附近选择一个干净、平坦且坚固的工作空间,将装有主板的盒子放在上面。
DS200TCRAG1ACC继电器输出板Mark V板美国通用电气GE
The GE relay output board DS200TCRAG1ACC contains 30 plug-in relays. It also has four 34-pin connectors and four 12-pin connectors. The ids assigned to the 34-pin connector are JOR, JOS, JOT, and JO. The ids assigned to 12-pin connectors are JS3, JS4, JS5, and JS6.
Because there are multiple connectors on the GE relay output board DS200TCRAG1ACC, the guidelines must be followed to ensure that you can quickly connect the cable to the correct connector on the replacement board. Before starting the replacement, make sure you know the location of the drive current emergency cutoff device.
In addition, you must understand how to operate the shutdown device and confirm that it is in good working order. Those familiar with transmission installation will receive detailed information on power supply and emergency cutoff. The next step is to verify that the floor in the area around the hard drive is clean and free of moisture or standing water. Use a cleaner to remove oil from the floor. You should also remove all ungrounded double-ended power cords because of the risk of electric shock.
The best practice is to inform operators and managers of other equipment in the work area that work is scheduled so that they can plan for disruption and have a response plan. Choose a clean, flat, and sturdy workspace near the hard drive and place the box with the motherboard on it.
相关推荐